{"id":775,"date":"2024-06-10T15:15:42","date_gmt":"2024-06-10T15:15:42","guid":{"rendered":"https:\/\/demosites.royal-elementor-addons.com\/business-consulting-v2\/?p=775"},"modified":"2025-06-02T05:09:54","modified_gmt":"2025-06-02T05:09:54","slug":"timisoara-al-doilea-oras-din-tara-cu-linie-feroviara-catre-aeroport-cfr-infrastructura-a-lansat-licitatia-pentru-constructia-liniei-de-5-km","status":"publish","type":"post","link":"https:\/\/infradandb.com\/ro\/timisoara-al-doilea-oras-din-tara-cu-linie-feroviara-catre-aeroport-cfr-infrastructura-a-lansat-licitatia-pentru-constructia-liniei-de-5-km\/","title":{"rendered":"Timi\u0219oara, al doilea ora\u0219 din \u021bar\u0103 cu linie feroviar\u0103 c\u0103tre aeroport: CFR Infrastructur\u0103 a lansat licita\u021bia pentru construc\u021bia liniei de 5 km"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"775\" class=\"elementor elementor-775\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-43d910b e-flex e-con-boxed wpr-particle-no wpr-jarallax-no wpr-parallax-no wpr-sticky-section-no e-con e-parent\" data-id=\"43d910b\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7d5d9c9 elementor-widget elementor-widget-heading\" data-id=\"7d5d9c9\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">CFR Infrastructur\u0103, prin intermediul Regionalei CFR Timi\u0219oara, a lansat licita\u021bia pentru proiectarea \u0219i construc\u021bia liniei de tren dintre Gara de Est \u0219i Aeroportul Timi\u0219oara.<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4bf2f28 elementor-widget elementor-widget-text-editor\" data-id=\"4bf2f28\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"74\" data-end=\"862\">Noua linie este o ramifica\u021bie a magistralei M 100 Bucure\u0219ti-Timi\u0219oara, are 5 kilometri lungime \u0219i va fi electrificat\u0103. Contractul \u00een valoare de peste 300 de milioane de lei include, de asemenea, modernizarea liniei existente Timi\u0219oara Est \u2013 Radna, cu o lungime de 5,2 km. Guvernul a aprobat investi\u021bia la \u00eenceputul acestui an, dup\u0103 cum a scris Economedia. Coinciden\u021b\u0103 sau nu, licita\u021bia a fost lansat\u0103 vineri, 27 octombrie, chiar \u00een ziua vizitei ministrului Transporturilor Sorin Grindeanu la Aeroportul Timi\u0219oara, unde se desf\u0103\u0219oar\u0103 lucr\u0103ri de modernizare. Licita\u021bia ar fi trebuit lansat\u0103 \u00eenc\u0103 din luna iulie. \u00cen prezent, doar Bucure\u0219tiul are o leg\u0103tur\u0103 feroviar\u0103 direct\u0103 cu aeroportul, prin linia din Gara de Nord, iar \u00een 2027, conform promisiunilor, \u0219i prin Magistrala 6 de metrou (M6).<\/p><p data-start=\"864\" data-end=\"980\">Durata contractului este de 30 de luni, dintre care 8 luni pentru proiectarea tehnic\u0103 \u0219i 22 de luni pentru execu\u021bie.<\/p><p data-start=\"982\" data-end=\"2083\">\u201eCompania Na\u021bional\u0103 de C\u0103i Ferate CFR SA v\u0103 informeaz\u0103 c\u0103 SRCF Timi\u0219oara a lansat procedura de achizi\u021bie public\u0103 pentru proiectarea \u0219i execu\u021bia lucr\u0103rilor de construc\u021bie a unei linii de cale ferat\u0103 care va asigura o leg\u0103tur\u0103 direct\u0103 cu Aeroportul Interna\u021bional Traian Vuia din Timi\u0219oara \u0219i modernizarea liniei de cale ferat\u0103 Timi\u0219oara Est \u2013 Radna, de unde se va construi leg\u0103tura feroviar\u0103 spre Aeroport. Valoarea total\u0103 estimat\u0103 a contractului este de 323.297.762,98 lei f\u0103r\u0103 TVA, iar sursa de finan\u021bare va fi asigurat\u0103 din fonduri nerambursabile. Obiectul contractului include modernizarea liniei existente Timi\u0219oara Est \u2013 Radna, pe \u00eentreaga lungime de 5,2 km, construirea unei linii de cale ferat\u0103 duble, electrificate (de la punctul de racord) spre Aeroport, cu o lungime total\u0103 de 5 km, \u0219i construirea unei noi g\u0103ri, cu dou\u0103 linii de sta\u021bie, \u00een imediata vecin\u0103tate a Aeroportului. Durata de proiectare \u0219i execu\u021bie a lucr\u0103rilor va fi de 30 de luni, dintre care 8 luni pentru elaborarea proiectului tehnic \u0219i 22 de luni pentru execu\u021bia lucr\u0103rilor\u201d, se arat\u0103 \u00eentr-un comunicat al CFR Infrastructur\u0103.<\/p><p data-start=\"2085\" data-end=\"2186\">\u201eCrearea unei leg\u0103turi feroviare cu Aeroportul Interna\u021bional Traian Vuia din Timi\u0219oara contribuie la:<\/p><ul data-start=\"2188\" data-end=\"2582\"><li data-start=\"2188\" data-end=\"2437\"><p data-start=\"2190\" data-end=\"2437\">dezvoltarea \u0219i extinderea conexiunilor de transport aerian cu alte moduri de transport, prin interconectarea aeroportului cu re\u021beaua feroviar\u0103 na\u021bional\u0103 \u0219i cu re\u021beaua de transport european\u0103 TEN-T, precum \u0219i leg\u0103tura cu modurile de transport urban;<\/p><\/li><li data-start=\"2439\" data-end=\"2582\"><p data-start=\"2441\" data-end=\"2582\">atragerea unui num\u0103r c\u00e2t mai mare de pasageri din localit\u0103\u021bile \u00eenvecinate c\u0103tre transportul feroviar etc.\u201d, se arat\u0103 \u00een Nota de fundamentare.<\/p><\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>CFR Infrastructur\u0103, prin intermediul Regionalei CFR Timi\u0219oara, a lansat licita\u021bia pentru proiectarea \u0219i construc\u021bia liniei de tren dintre Gara de Est \u0219i Aeroportul Timi\u0219oara. Noua linie este o ramifica\u021bie a magistralei M 100 Bucure\u0219ti-Timi\u0219oara, are 5 kilometri lungime \u0219i va fi electrificat\u0103. Contractul \u00een valoare de peste 300 de milioane de lei include, de asemenea, modernizarea liniei existente Timi\u0219oara Est \u2013 Radna, cu o lungime de 5,2 km. Guvernul a aprobat investi\u021bia la \u00eenceputul acestui an, dup\u0103 cum a scris Economedia. Coinciden\u021b\u0103 sau nu, licita\u021bia a fost lansat\u0103 vineri, 27 octombrie, chiar \u00een ziua vizitei ministrului Transporturilor Sorin Grindeanu la Aeroportul Timi\u0219oara, unde se desf\u0103\u0219oar\u0103 lucr\u0103ri de modernizare. Licita\u021bia ar fi trebuit lansat\u0103 \u00eenc\u0103 din luna iulie. \u00cen prezent, doar Bucure\u0219tiul are o leg\u0103tur\u0103 feroviar\u0103 direct\u0103 cu aeroportul, prin linia din Gara de Nord, iar \u00een 2027, conform promisiunilor, \u0219i prin Magistrala 6 de metrou (M6). Durata contractului este de 30 de luni, dintre care 8 luni pentru proiectarea tehnic\u0103 \u0219i 22 de luni pentru execu\u021bie. \u201eCompania Na\u021bional\u0103 de C\u0103i Ferate CFR SA v\u0103 informeaz\u0103 c\u0103 SRCF Timi\u0219oara a lansat procedura de achizi\u021bie public\u0103 pentru proiectarea \u0219i execu\u021bia lucr\u0103rilor de construc\u021bie a unei linii de cale ferat\u0103 care va asigura o leg\u0103tur\u0103 direct\u0103 cu Aeroportul Interna\u021bional Traian Vuia din Timi\u0219oara \u0219i modernizarea liniei de cale ferat\u0103 Timi\u0219oara Est \u2013 Radna, de unde se va construi leg\u0103tura feroviar\u0103 spre Aeroport. Valoarea total\u0103 estimat\u0103 a contractului este de 323.297.762,98 lei f\u0103r\u0103 TVA, iar sursa de finan\u021bare va fi asigurat\u0103 din fonduri nerambursabile. Obiectul contractului include modernizarea liniei existente Timi\u0219oara Est \u2013 Radna, pe \u00eentreaga lungime de 5,2 km, construirea unei linii de cale ferat\u0103 duble, electrificate (de la punctul de racord) spre Aeroport, cu o lungime total\u0103 de 5 km, \u0219i construirea unei noi g\u0103ri, cu dou\u0103 linii de sta\u021bie, \u00een imediata vecin\u0103tate a Aeroportului. Durata de proiectare \u0219i execu\u021bie a lucr\u0103rilor va fi de 30 de luni, dintre care 8 luni pentru elaborarea proiectului tehnic \u0219i 22 de luni pentru execu\u021bia lucr\u0103rilor\u201d, se arat\u0103 \u00eentr-un comunicat al CFR Infrastructur\u0103. \u201eCrearea unei leg\u0103turi feroviare cu Aeroportul Interna\u021bional Traian Vuia din Timi\u0219oara contribuie la: dezvoltarea \u0219i extinderea conexiunilor de transport aerian cu alte moduri de transport, prin interconectarea aeroportului cu re\u021beaua feroviar\u0103 na\u021bional\u0103 \u0219i cu re\u021beaua de transport european\u0103 TEN-T, precum \u0219i leg\u0103tura cu modurile de transport urban; atragerea unui num\u0103r c\u00e2t mai mare de pasageri din localit\u0103\u021bile \u00eenvecinate c\u0103tre transportul feroviar etc.\u201d, se arat\u0103 \u00een Nota de fundamentare.<\/p>\n","protected":false},"author":1,"featured_media":1690,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29],"tags":[9,11,19],"class_list":["post-775","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tenders","tag-business-development","tag-change-management","tag-tech-solutions"],"acf":[],"_links":{"self":[{"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/posts\/775","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/comments?post=775"}],"version-history":[{"count":8,"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/posts\/775\/revisions"}],"predecessor-version":[{"id":1910,"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/posts\/775\/revisions\/1910"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/media\/1690"}],"wp:attachment":[{"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/media?parent=775"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/categories?post=775"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infradandb.com\/ro\/wp-json\/wp\/v2\/tags?post=775"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}